Client: Vinci Construction for Jaguar Land Rover i54 Wolverhampton

Area: Material Planning and Logistics canopy roof

Requirement: Laydown scaffold to new office roof

A scaffold laydown was required to be built off existing steelwork to enable works at high level to ducting and cable trays. Reactive Design produced a bespoke design for a scaffold deck utilising gravlock couplers in pairs @2m centres giving a deck rating of 2KN/m².

Design Drawings